Inspection, tolerance and dust control

Machining is complete only when geometry, edge integrity, cleanliness and worker exposure controls are verified.

In simple terms

Machining is complete only when geometry, edge integrity, cleanliness and worker exposure controls are verified.

Production release and controlled rework.

Respirators do not replace enclosure or local exhaust and require an exposure assessment and programme.

Drill cells, trim booths and repair shops.

Related tools

Use the calculators to turn these concepts into preliminary engineering estimates.